Skip to main content

Compare Solar Panels

Installation

Solar Panel Installation

From survey to switch-on, a professional solar installation is usually quicker and less disruptive than people expect. Compare free quotes from vetted, MCS-certified installers covering your area.

Get Free Quotes

Get Free Solar Quotes

Takes less than a minute — no obligation.

Why Solar

What Happens During Installation?

It starts with a survey: the installer checks your roof direction, pitch, condition, shading and available space, plus your consumer unit and where the inverter will go. They then design a system sized to your home and energy use.

On installation day, scaffolding goes up, mounting rails are fixed to the roof, panels are attached and the system is wired to an inverter and your consumer unit. Most domestic installations are completed within one to two days, followed by commissioning and registration.

Benefits

What to Look For

MCS Certification

Normally required for your system to qualify for the Smart Export Guarantee.

Clear, Itemised Quotes

Panels, inverter, battery, scaffolding and labour all listed separately.

Warranties & Aftercare

Product and workmanship warranties, plus support after installation.

Simple & Quick

How It Works

1

Tell Us About Your Home

Answer a few quick questions about your property and energy use — under a minute.

2

Get Matched

We match you with vetted, MCS-certified installers who cover your area.

3

Compare Quotes

Receive free, no-obligation quotes and compare price, panels and warranties.

4

Choose & Install

Pick the installer that suits you and start generating your own clean energy.

Why Compare Solar Panels

Why Compare Through Us

  • Vetted, accredited installers — we only match you with reputable, MCS-certified companies.
  • Free & no obligation — compare quotes with no pressure and no cost to you.
  • Handled securely — your details are only used to match you with suitable installers.

Get Free Quotes

FAQs

Frequently Asked Questions

How long does solar panel installation take?

Most domestic installations are completed in one to two days, plus time for scaffolding, commissioning and registration.

Do I need planning permission for solar panels?

For most homes solar panels are permitted development, but there are exceptions — listed buildings and conservation areas in particular. Your installer will advise.

Will installation damage my roof?

A competent installer will fit mounting hardware correctly and weatherproof it. Always use an accredited installer and check their workmanship warranty.

What is MCS certification?

The Microgeneration Certification Scheme accredits installers and products. It is normally required for Smart Export Guarantee eligibility.

Compare Installation Quotes

Vetted, MCS-certified installers — free and no obligation.

Get Free Quotes